Skip to content NEWGarments & textile factories: free rooftop solar energy auditLearn more →
GARMENTS · TEXTILE · RMG

Your factory roof is your cheapest power.

কারখানার ছাদেই সবচেয়ে সস্তা বিদ্যুৎ।

Rooftop solar, sub-stations, generators and UPS for RMG and textile factories — sized for heavy daytime loads, ready for buyer sustainability audits, and built so the lines never stop.

Book a free factory energy audit See the plan
1,768 MWp of solar could fit on Bangladesh's RMG and textile factory roofs. Centre for Policy Dialogue study, August 2026
3% of the electricity surveyed factories use comes from renewables today. CPD survey of 878 factories in Gazipur and Narayanganj
World No. 1 Bangladesh has more LEED-certified green garment factories than any other country. US Green Building Council data
The problem

What we hear from garments & textile

Shifts run when the sun shines

Sewing, cutting and finishing draw their heaviest load in daylight — exactly when a rooftop plant produces most.

Buyers ask for cleaner energy

Global brands are tightening decarbonisation targets for their suppliers. Solar on the roof is the most visible step.

Generators are costly to run

Every hour on diesel or gas adds up. Solar trims daytime generator hours and grid bills together.

Dips stop the line

Voltage swings trip machines and damage CAD, embroidery and ERP systems. Stable power protects output.

The plan

The right system for each part of the site

ROOF

Rooftop solar plant

On-grid or hybrid, sized to your roof and daytime load, with net metering where your utility allows.

SUB-STATION

Transformers & panels

Sub-station equipment and HT/LT panels for new buildings and expansions.

BACKUP

Diesel & gas generators

Soundproof gensets with automatic changeover, working alongside the solar plant.

PRODUCTION FLOOR

Voltage stabilizers

Clean, steady voltage for sewing, cutting and embroidery machines.

OFFICE & IT

Online UPS

Zero-break power for ERP servers, CAD and the merchandising floor.

Ready for audits

Numbers you can check.

Every plant we install reports to an online monitoring dashboard — daily generation, peak output and CO₂ avoided.

See a real plant's numbers
LIVE EXAMPLE · PETROBANGLA
50 kWpsolar capacity on the roof
11,585.7 kWhgenerated, 1 Feb – 4 Apr 2026
39.6 kWpeak output, 14 Feb at 09:35
Projects

Garments & textile projects

All projects

Be our next garments & textile project.

Case studies for this sector are coming soon.

Talk to an engineer
Other industries
ISP & telecom →Hospitals & diagnostics →Offices & commercial →Agriculture & pumps →Homes →

Send us 12 months of electricity bills. We'll size your roof, model the savings and show the payback — free.

বিনামূল্যে সাইট ভিজিট ও মূল্যায়ন।

Book now